MOST RENEWABLE INFRASTRUCTURE IS FAIRLY NEW, BUT ALL WILL EVENTUALLY NEED TO BE DECOMISSIONED ONE DAY.
IT’S A LESSON BEING ILLUSTRATED IN AN UNLIKELY LOCATION.
A CANADIAN PHEASANT HATCHERY.
THE PLACE IS FILLED WITH THOUSANDS OF DAMAGED SOLAR PANELS.
THIS COLLECTION OF ALMOST 10,000 PANELS IS THE WORK OF SUNSET RENEWABLE ASSET MANAGEMENT-
A COMPANY WORKING TO FIND NEW SOLUTIONS FOR THE DISPOSAL OF GREEN ENERGY TECH.
THEY’RE COLLECTING THESE BROKEN PANELS IN THE HOPES OF IDENTIFYING FINANCIALLY VIABLE METHODS OF EXTRACTING AND RE-USING THE VALUABLE CRITICAL MINERALS THEY CONTAIN.
EXPERTS PREDICT THAT BY 20-50, CANADA ALONE COULD BE DEALING WITH NEARLY 5 MILLION TONS WORTH OF WIND AND SOLAR POWER WASTE.
AS ONE RESEARCHER FROM A UNIVERSITY OF OTTAWA THINK TANK PUT IT-
WE’RE CREATING OTHER ENVIRONMENTAL PROBLEMS WHILE TRYING TO ADDRESS THE CLIMATE PROBLEM.
WHICH IS WHERE COMPANIES LIKE RENEWABLE ASSET MANAGEMENT COME IN-
WORKING ON WAYS TO EFFICIENTLY RECYCLE THE MATERIALS USED TO MAKE THIS INFRASTRUCTURE.
THE COMPANY SETTLED ON USING A LARGE INDUSTRIAL BUILDING ONCE USED TO HOUSE PHEASANTS AS THE LOCATION OF THE SOLAR PANEL GRAVEYARD THEY AIM TO HELP FIND NEW LIFE.
WHILE BOTH SOLAR PANELS AND WIND TURBINES ARE AS MUCH AS 90 PERCENT RECYCLABLE ITS STILL AN EXPENSIVE PROCESS.
SOME LARGER SCALE SOLAR FARMS WILL COSTS TENS OF MILLIONS OF DOLLARS TO RECYCLE-
WHEN JUST DUMPING IN THEM IN A LANDFILL WOULD ACTUALLY BE ALMOST 90 PERCENT CHEAPER.
AND SOME ESTIMATES PUT THE COST OF DECOMMISSIONING JUST A SINGLE TURBINE AT OVER HALF A MILLION DOLLARS.
BOTH LOCAL AND NATIONAL GOVERNMENTS ARE DISCUSSING THE DEVELOPMENT OF MORE COHERENT RECYCLING SYSTEMS FOR THIS TECH.
BUT FOR NOW IT REMAINS A PROBLEM THAT WILL BECOME MORE PERSISTENT AS THE GREEN ENERGY TRANSITION CONTINUES.
JACK AYLMER – STRAIGHT ARROW NEWS.